MIL-DTL-24695C(SH)
3.5.2.2 Flexibility. The hose assembly shall exhibit no evidence of permanent deformation when pressurized to
310 bars (4,500 lb/in2) operating pressure at a bend radius of 40 millimeters (1.57 inches) (see 4.2.4.3).
3.5.2.3 Leakage. The hose assembly shall show no sign of leakage after 2 hours under an operating pressure of
3.5.2.4 Burst pressure. The hose assembly shall withstand a burst pressure of 1,240 bars (18,000 lb/in2) with
no sign of leakage (see 4.2.4.5).
3.5.3 Adapters.
3.5.3.1 Proof pressure. The adapter shall withstand a proof pressure of 465 bars (6,750 lb/in2) without
permanent deformation or damage (see 4.2.5.2).
3.5.3.2 Operation. The torque required to couple hose assembly to the adapter shall not exceed
2.0 Newton meters (18 inch-pounds) (see 4.2.5.4).
3.5.3.3 Leakage. The adapter shall show no sign of leakage after 2 hours under an operating pressure of
3.5.3.4 Burst pressure. The adapter shall withstand a burst pressure of 620 bars (9,000 lb/in2) without any sign
of rupture or permanent deformation (see 4.2.5.5).
3.6 Marking. Each valve and each hose assembly shall be identified with a metal or plastic tag (see 4.2.3.1 and
4.2.4.1) bearing the following information:
Manufacturer s name, trademark, or logo.
a.
b.
Specification sheet part number.
Manufacturer s part number.
c.
d.
Assembly date (by quarter and year).
3.7 Interchangeability. In no case shall parts be physically interchangeable or reversible unless such parts are
also interchangeable or reversible with regard to function, performance, and strength (see 4.2.3.1).
3.8 Workmanship. Vent and test valves, hose assemblies, and adapters shall be free from porosity, roughness,
4. VERIFICATION
4.1 Classification of inspections. The inspection requirements specified herein are classified as follows:
a.
Qualification inspection (see 4.2).
b.
Conformance inspection (see 4.3).
4.2 Qualification inspection. Qualification inspection shall be conducted at a laboratory approved by the Naval
Sea Systems Command (NAVSEA). Qualification inspection shall consist of the tests and examinations as specified
in 4.2.1 through 4.2.6 and shall be conducted in the order as shown in tables I, II, and III unless otherwise approved
by the qualifying activity.
5
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business